Test of the Optical Links for the Belle Event Builder



Tx(left side) and ECL-Opt(black module) modules in the Electronics Hut. The optical cables go to the junction box outside the hut.

Opt-ECL (black module) at B3. The brown line (G-link) is connected to Rx module in the Online-Farm crate.
Photos are taken on 27-Feb-1998.
Return to Slide Index