Status of the TREK experiment
- 2003: Letter of Intent submitted to J-PARC
- 2006: Proposal submitted to J-PARC and approved for stage 1
- 2007: Start of detector R&D and budget request
- 2007: TRIUMF S1120 μSR test experiment to study stopper material
- 2007: Beam test of the CsI(Tl) readout system with APD at Tohoku electron linac
- 2007: Beam optics design of the K0.8 beamline in the J-PARC Hadron Hall
- 2008: Start of the active polarimeter construction
- 2008: MPPC radiation hardness test at TRIUMF with a pion beam
- 2008: Polarimeter chamber prototype test at the Fuji Test Beam Line at KEK
- 2009: Construction of a full sized 1-sector prototype polarimeter chamber